Dear Sir / Madam,
We, Pertamina International Shipping Pte Ltd, invites Shipowner/Shipbrokers to bid for a trading vessel, with the following specification, terms, and conditions as follow:
*Each broker only can submit maximum 3 ships in one tender
Laycan |
Cargo (MT) |
Load |
Disch |
19-20 March 2025 |
22,500 MT Propane & 22,500 MT Butane (+/- 5% tolerance) |
1 SP / SB Freeport, Texas, USA |
INCHO黑料不打烊:
|
*) Freight with a multi-port discharge scheme (2 discharge ports).
A. Specification:
No. |
Description |
VLGC – LPG Fully Refrigerated |
1 |
Type Vessel |
LPG Fully Refrigerated |
2 |
D.W.T |
Max. 60,000 MT |
3 |
Year of Built |
2005 up (max 20 Years) |
4 |
Flag |
Indonesia / Foreign Flag |
(Indonesian Flag will be preferable) |
||
5 |
COT Capacity |
Min. 78,000 m3 |
6 |
Cargo Composition |
50 % Propane + 50% Butane (±5%) |
7 |
Cargo Carrying Capacity |
Min. 45,000 MT with expected total quantity 47,000 MT |
8 |
Draft |
Max. 12.58 m |
9 |
LOA |
Max. 230 m |
10 |
Service Speed |
Min. 15 knots |
11 |
Discharging Cargo to Shore Conditions |
LPG Fully Refrigerated |
12 |
Segregated Ballast Tank |
Required |
13 |
Loading Rate |
Min. 2000 m3/hr per grade |
14 |
Discharge Rate or Pressure |
Min. cumulative 1000 m3/hr or 7kg/cm2 |
15 |
Derrick / Crane |
Min. 5 Tonnes |
16 |
Information System |
Internet On Board (24 Hours) |
17 |
Simultaneous transport |
Two grades can be loaded and discharged simultaneously |
18 |
Cargo Tank Condition |
|
19 |
SIRE |
Valid operational SIRE during charter period |
20 |
Laycan |
19-20 March 2025 |
21 |
Loading Port |
1 SP/ SB Freeport, Texas, USA |
22 |
Discharge Port |
Tanjung Sekong/ Tanjung Uban/ STS Kalbut/ Arun/ STS Balikpapan/ STS Pangkalan Susu/ Arun – STS Pangkalan Susu*/ STS Kalbut – STS Balikpapan* INCHO黑料不打烊 |
*) Freight with a multi-port discharge scheme (2 discharge ports).
B. Terms & Conditions :
1. |
Total Laytime |
120 hours total SHINC basis 1 to 1 load/discharge port Early loading clause: if charterers allow vessel to load earlier than laycan, time from all fast until commencement of laytime or completion of loading whichever first occurred, shall be calculated as half laytime |
2. |
Terminal Approval |
Vessel should be accepted by the Terminal both ends |
3. |
Charter Party Form |
Asbatankvoy |
4. |
Freight Cost |
in USD Lumpsum Basis 1 : 1 or 1:2 (incl. Withholding Tax, Canal Cost if any, Port Cost, AWRP, Armed Guard, STS Cost at Discharge Port any other cost related to Owner’s responsibility but excluding VAT) |
5. |
Demurrage Rate |
in USD PDPR (incl. Withholding Tax) Charterers shall be discharged and released from all liability in respect of any charges/ claims owners may send to charterers under this charter, unless any such charges/claims have been received by charterers in writing within 45 (fourty-five) days from completion of discharge of the cargo concerned under this charter. Charterers shall promptly notify the owners of any objections to any demurrage claim under this charter party. unless the owners have received such notification within 45 (fourty-five) days after the charterers' receipt of the claim, the charterers shall be deemed to have waived objection to the claim which shall be deemed accepted by the charterers as presented. |
6. |
Transit Loss |
Max. 0.07% |
7. |
Comm Structure |
2.5% Address Commission to Charterers on Freight/ Demurrage (If Any) deductible at source |
8. |
Term of Payment (Mandatory, Non-Negotiable) |
Freight shall be paid in U.S. Dollars within 14 (fourteen) banking days upon completion of discharge and completed invoicing documents (as below) received by Charterer.
Demurrage and additional cost requirement shall be paid in U.S. dollars within 14 (fourteen) banking days upon completion of discharge and completed invoicing documents (as below) received by Charterer.
|
9. |
Charter Party Administration Clause
|
Charter party terms and conditions are evidenced by the fixture confirmation via cable, telex, electronic mail or facsimile approved (by answering cable, telex, electronic mail, facsimile) by both owner and charterer. The formal written charter party shall be signed by owner and charterer. The owner and/or owner's broker shall prepare a charter party as modified by the fixture recap. This should be completed within 14 days after the date of fixture recap. |
10. |
Free Pratique |
If free pratique is not granted within 6 hours of the master tendering NOR, through no fault of owners, agents or those on board the vessel, the master shall issue a protest in writing (NOP) to the port of authority and the facility at the port (terminal) failing which laytime or, if the vessel is on demurrage, demurrage shall only commence when free pratique is granted. |
11. |
Conoco Weather Clause |
Delays in berthing for loading and discharging and any delays after berthing which are due to weather conditions shall count as fifty:fifty laytime or if on demurrage, at demurrage rate. |
12. |
Crew List |
Owners will state if the crews are not included in the sanctions list and willing to provide indemnity in the event of a violation. |
13. |
Agent |
Owners to appoint Charterers nominated agents provided competitive |
14. |
Vessel should be ready to perform the voyage without bunkering in laden passage. |
|
15. |
When submitting the offer, please also attach vessel docs (Q88, Gas Form C, P&I, ISSC, CLC, CLBC), last three cargoes, updated class survey status, SIRE report, updated crew matrix, tank configuration, and stowage plan max loadable basis 50% C3 : 50% C4 split. |
|
16. |
Charterer may take more than one vessel for this enquiry. |
|
17. |
One Broker can offer maximum 3 vessels. |
|
18. |
Subject to Terminal and Charterer’s Management Approval. |
Please submit your best offer by replying to this email latest Tuesday, 11 February 2025 at 14:00 Dubai Time, with validity until 16:00 Dubai Time.
Looking forward to your favorable proposal. Thank you
Regards,
Chartering Committee
PERTAMINA INTERNATIONAL SHIPPING 黑料不打烊E LTD
Millenia Tower #32-03
1 Temasek Avenue
Singapore 039192
E : pis.chartering3@pertamina.com